Thirty kilometres of weld: building a Seine Bulk 110 hull in Rouen
People imagine a shipyard as a place of sparks and noise, and they are not wrong. But building a hull like the Seine Bulk 110 is above all a matter of patience and precision. The finished barge is 110 metres long and carries 2,600 tonnes of cargo. Before it carries anything, it has to be cut, shaped, welded and inspected, piece by piece, by a team of about forty people in our Rouen yard.
We build the hull in blocks. Each block is a section of the barge, about 10 metres long, assembled in the hall from steel plates and stiffening frames. The plates arrive pre-cut from a supplier in Lorraine, and our team bends, fits and welds them into shape. Most of the long straight seams are done by automated welding carriages that run along a track, giving a perfectly even weld over many metres. The corners, joints and awkward places are done by hand, and that is where experience matters.
Over a whole hull we lay something like thirty kilometres of weld. Every metre is inspected. Visual checks happen as we go, and critical seams, such as those around the hydrogen tank bays and the bottom of the hull, are tested with ultrasound to find any flaw inside the metal. Leïla Nasser's hydrogen safety team adds its own inspections on the tank compartments, because those spaces must be completely sealed from the rest of the hull and properly ventilated to the air.
Once the blocks are finished, they are moved by crane onto the slipway and joined together. This is the most satisfying moment of the build: over a couple of weeks, a set of steel boxes becomes a ship. After the hull is complete, it is blasted, painted and handed over to the outfitting team, who install the fuel cell, the battery, the wheelhouse and the cargo hold covers. The first Seine Bulk 110 was launched on 11 February 2025, and I still remember the cheer when she floated.
I have welded hulls for more than twenty years, on everything from tugs to ferries. What I like about this work is that the boats we build will run for decades, carrying cargo that would otherwise fill hundreds of lorries on the motorway to Paris. When I see a Seine Bulk pass the yard fully laden, I know my team's welds are holding all that weight. It is a good feeling, and it never gets old.