Blog post
Foils on a river: what we are learning from the Swift Foil 9
The Swift Foil 9 first touched the water at our Rouen trials base on 30 April 2026, and I have spent more hours on her since then than on any other hull this year. She is still a prototype, so nothing in this post is a promise. But the questions people ask about foiling on a river are good ones, and some of the answers surprised even us.
The idea is simple. At low speed the Swift Foil is a normal 9 metre electric boat with room for 12 passengers. As she accelerates, carbon wings under the hull generate lift and raise the hull clear of the surface. With the hull out of the water, drag falls dramatically. At up to 40 km/h she uses about 2.8 kWh per km, which is less than half of what a conventional hull of this size would need at that speed. The design range is 70 km, enough for several commuter runs between recharges.
The first lesson was about debris. Rivers carry branches, plastic and the occasional lost fender, and a foil at speed does not like hitting any of them. Anna Kowalska's team added a forward-looking sonar and camera that scans the water ahead and slows the boat smoothly before anything solid reaches the wings. We have also made the front foil designed to break away at a set load, so a serious strike costs a replacement part rather than a damaged hull.
The second lesson was about wash, and here the news is good. Once she is foiling, the Swift Foil makes remarkably little wave. The hull is out of the water and the thin struts barely disturb it. Walkers on the towpath near Rouen often do not notice her until she has passed. The difficult moment is the transition from floating to flying, when the wash briefly peaks, so the controller now manages that transition in open stretches and never near moored boats or quays.
Will we see foils in central Paris? Not soon. Speed limits there are low for good reasons, and the Pont Shuttle 24 already does the job of moving 120 people at a time very well. Where we see a future for the Swift Foil is on longer, straighter suburban stretches, where a fast commuter link could compete with the train. We are now running timed trials on a route that mimics the kind of service an operator might want, and I will report back when the data is in.